Signing for data center land before the power and permission answers is the costly mistake. Do the checks first, or make the sale conditional on them.

The steps, in order
- Power. Ask the utility for the date and size of power, in phases. See what to ask the utility.
- Permission. Find out if the use is allowed by right, needs a special permit, or is not allowed. See industrial zoning is not permission. In India, check the land use and the state policy first: data center land in India.
- Usable land. Subtract setbacks, easements, flood areas and slope, then test whether the halls, plant and substation fit.
- Water and cooling. Confirm the supply source and the discharge route.
- Access and fibre. Road access for heavy equipment and the carrier routes nearby.
- Title and approvals. Counsel confirms ownership, and you list every authority that must approve.
Ways to reduce risk
- Make the sale conditional on the utility answer and the permission route.
- Ask for options on phased land, not all of it at once.
- Write down what is not confirmed and price it.
What the study gives you
Keystone prepares early data-center site studies for India and the USA. The study compares campus options for the site, with power needs, cost range, timeline and estimated returns. Each finding is marked measured, assumed or not checked.
Read the full guide: data center site selection.