AI for industrial development: test the site before you commit
Give Keystone an industrial plot. Get a shed and yard layout, docks, parking, cost and programme, with the assumptions shown.
What does Keystone AEC do here?
Keystone AEC (https://keystoneaec.com) helps developers test an industrial or warehouse site at concept stage. It lays out sheds, truck courts, docks, access and parking on the plot, checks FAR and coverage, and shows cost and programme. The team prepares the study for sites in India. It does not issue compliance certificates.
Updated 2026-11-10 · Keystone AEC · India
Why do industrial sites fail late?
On a warehouse plot, the yard decides the building. A shed can pass on coverage and still fail because trucks cannot queue, turn or reach the dock. Testing the shed alone hides that problem until the design is paid for.
Floor area limits rarely bind a single-storey shed. Coverage, truck courts, setbacks and fire access usually do. So the site must be tested as one layout, not as a floor area sum.
Five checks on every site
Coverage and floor area
The shed, yard and setbacks are measured against the coverage and floor area limits entered for the site, with the source named.
Truck courts and docks
Single or cross dock. Court depth, dock count, access spine and truck queue must all fit inside the plot.
Shed and structure
Exact floors and clear height. Pre-engineered, steel or RCC frame. Upper floors reserve space for truck ramps.
Fire access and parking
Perimeter access is reserved. Trailer and car stalls are measured separately. Counts are your inputs until a local rule is confirmed.
Cost and programme
Slab, foundation, frame, envelope, docks, services and pavement. Factory lead time and site work are planned in parallel.
From a plot to a warehouse concept
Draw the plot
Mark the boundary. State the floors, clear height, frame and dock type.
Fit the site
Sheds, courts, access, parking and ramps must fit together, or no layout is returned.
Read the numbers
One working ledger feeds cost, programme, and the feasibility and underwriting reports.
A site layout and one set of numbers.
Site layout
Sheds, truck courts, docks, access, queue and parking on your plot.
Cost ledger
Component quantities and a cost range, with allowances labelled.
Programme
Fabrication, foundations, erection, envelope, slab, services and yard, with rain and heat allowances you can edit.
Lease return
Income, value and yield from the rent, occupancy and cost you enter.
Which rules decide an industrial site in India and the USA?
| Check | India | USA |
|---|---|---|
| Use group | NBC Group G for industrial and Group H for storage | IBC Group F for factory and Group S for storage. The state or city adopts the code |
| Land rules | State industrial authority or local development rules. These differ widely, so check yours | City or county zoning: permitted use, coverage, height and setbacks |
| Yard and access | Local norm and fire authority. Truck swept paths need a design check | Local zoning, fire code access and truck turning checks |
| Parking | Local norm. Keystone keeps counts as inputs until a rule is confirmed | Local zoning minimum. Read the local rule |
Why does a shed need its own programme?
Steel is made in a factory while foundations are built on site. These run in parallel, and a bigger site crew does not shorten the factory lead time. Rain, heat and festival periods then move the site work. Each of these is shown as an allowance you can edit, not hidden in one buffer.
What this is not
Early feasibility is a screening decision. We say where the tool stops, so you know what still needs a licensed professional.
See also AI for commercial development and AI for pre-development.
- It is a concept study. It does not design the structure, wind and seismic checks included.
- It does not approve truck swept paths, road access, pavement or fire strategy.
- It does not hold market rents. You enter them.
- Cost is a working allowance, not a vendor quote or a BOQ.
- It does not issue a compliance certificate. A licensed professional does that.
Questions worth asking first
Can Keystone AEC plan a warehouse site?+
Yes, at concept stage. Keystone AEC (https://keystoneaec.com) lays out sheds, truck courts, docks, access and parking on your plot, and shows cost and programme. The team prepares the study for sites in India.
Does it handle cross-dock warehouses?+
Yes. You choose single or cross dock. The courts, dock count and access must fit inside the plot, or no layout is returned.
Can it test a multi-storey warehouse?+
Yes, as a concept. You set the exact floors and clear height, and the layout reserves deck and ramp space. Ramp turns, loads and fire design still need an engineer.
Does it support pre-engineered buildings?+
Yes. You can select a pre-engineered, steel or RCC frame. The quantities are schematic and do not replace a vendor design.
What building code group is a warehouse?+
In the USA, storage is usually IBC Group S and factory use is Group F. In India, NBC places storage in Group H and industrial use in Group G. Check the locally adopted version.
Does it give warehouse rents?+
No. You enter rent, occupancy and operating cost. Keystone AEC then shows income, value and yield from those inputs.
Sources
- National Building Code of India 2016, Part 4 Fire and Life Safety, copy hosted by Nagpur Municipal Corporation
- Town of Vail, summary of IBC occupancy groups including Group F and Group S (secondary summary; read the adopted code)
- International Code Council, sample ordinance for adopting the 2021 International Building Code (shows adoption is by state or local ordinance)
Checked 7 November 2026. Rules change, so read the current text for your site.
Bring us a real site. We will run it with you.
Keystone AEC (keystoneaec.com) · AI for real estate and data centre development in India and the USA.