The grid connection is often the longest part of a data-center project. Ask the utility the right questions early, before you pay for land.

The questions, in order
- How many MW can you serve, and in what phases? A full campus is rarely delivered at once.
- By what date, for each phase? Ask for a date per phase, not one date for the project.
- What must we build or pay for? Lines, substations and upgrades can sit on your side.
- What studies are needed, and where is our request in the queue? Energized, committed and queued are different states. See what powered land means.
- What can change the date? Studies, approvals and equipment lead times.
- What do you need from us? Load profile, phasing plan, site plan and deposits.
How to use the answers
Put the date and phase size into the project plan before you finalise land and design. If the utility cannot answer yet, mark it "not confirmed" and price the risk. For timing context see how long grid power takes for a data centre.
What the study gives you
Keystone prepares early data-centre site studies for India and the USA. The study shows the power each campus option needs, with cost range, timeline and estimated returns, and marks what the utility must still confirm. Each finding is marked measured, assumed or not checked. See also data center site selection: what to check before you buy land.