Use this list to screen data center sites. The order matters: the first checks remove the most sites, so run them before you spend on the rest.

The 12 checks
- Power date. When can power arrive?
- Power size and phases. How many MW, in what steps?
- Utility cost to you. Lines and upgrades you must build or pay for.
- Permission route. By right, special permit or not allowed. See industrial zoning is not permission.
- Pauses or limits. Any local pause or rule change in force or proposed.
- Usable land. What remains after setbacks, easements and flood areas.
- Fit. Whether the halls, plant, backup power and substation fit.
- Water and cooling. Supply source and discharge route.
- Road access. Heavy equipment and haul routes.
- Fibre and network. Carrier routes and distance to exchanges.
- Hazards. Flood, seismic zone, heat and other risks for the exact parcel.
- Cost, timeline and returns. Last, because every check above moves them.
How to use the list
Mark each check as confirmed, assumed or not checked. A site with an unconfirmed check 1 or 4 is not ready for more spend. For the full guide see data center site selection: what to check before you buy land. For India see data center site selection in India.